1908
GUSN-381699
The image shows the start of reconstruction work on the Cunard Line Pier at Platform Dock #3 in East Boston, Massachusetts. Visible are wooden structures and materials being assembled in the foreground. In the background, a large brick warehouse with fire escape staircases can be seen alongside a conveyor system. Construction equipment and piles of earth are also visible in the area.
piers (marine landings)
construction (assembling)
warehouses
belt conveyors
exterior views
harbors
photographs
gelatin dry plate negatives
negatives (photographic)
IMLS Negative Barcode NP002846
B-Series negative 9927-B
1 glass plate negative.
PC015
Boston & Albany Railroad Company photographic collection, 1890s-c. 1920
PC015.002.230.9927-B
Created Month: 12
East Boston (Boston, Suffolk county, Massachusetts) [neighborhood]
Boston and Albany Railroad Co.
gelatin dry plate negatives
negatives (photographic)
Piers
Construction
Item
Historic New England is committed to implementing reparative language description for existing collections and creating respectful and inclusive language description for new collections. If you encounter language in Historic England's Collections Access Portal that is harmful or offensive, or you find materials that would benefit from a content warning, please contact info@historicnewengland.org.
Loading...